Hi,
I've been using the so called "4m smoothing technique" on my coasters lately and the results are amazing, but I have two questions regarding the technique. I discovered the technique by watching a video posted by Silvarret on youtube. According to his explanation in the video, you have to go back and forth the whole coaster for a total of 8 times, but in the video comments and on other forums (reddit, here) people say that 4 times is enough. Can anyone elaborate on this?
Also, sometimes I have to place a longer track piece, say 5m or longer, on the track. Does this interfere with the 4m technique? Do I treat it as a 4m piece or should I jump over it?
Thanks
I've been using the so called "4m smoothing technique" on my coasters lately and the results are amazing, but I have two questions regarding the technique. I discovered the technique by watching a video posted by Silvarret on youtube. According to his explanation in the video, you have to go back and forth the whole coaster for a total of 8 times, but in the video comments and on other forums (reddit, here) people say that 4 times is enough. Can anyone elaborate on this?
Also, sometimes I have to place a longer track piece, say 5m or longer, on the track. Does this interfere with the 4m technique? Do I treat it as a 4m piece or should I jump over it?
Thanks