Today was a busy day of backstage building. This is my new and improved lion shelter. BVefore i started playing today only the row between the front and the glas was one long stripe with only minimal space for the lions, so i expanded it quite a bit to now feature 3 seperateable indoor areas on the left and back of the building, a small animal path between the main exhibit in the front and the new side exhibit for either striped hyenas or just to seperate the lions for longer times and on the right a second seperated indoor space.
View attachment 395636Running between the cages is the fully functional staff path with an acess point to every seperateable area and the main habitat, 2 moveable gates to actually seperate the main shelter into an entrance, main indoor and a small path area which is also connected to a gate to outside of the building as the place where lions are moved in and out of the habitat.
Theres also a little area with tools and storage space aswell as a hose to clean up the whole complex.
Gotta say, my modular backstage set really is doing some heavy lifting regarding me even being motivated to do all these backstage areas, so im really glad i kept going at it a year ago when i tried to made a river fence and accidentally created whats most likly the most usefull thing i ever made
View attachment 395637
View attachment 395638