I get 3.5, but it has to be flat at three and a half not angled going into three and a half.
At the easiest method of getting a path over a pool is to build it on flat ground, use multi-select to get the path, advanced move to bring it up to three and a half, and then advanced move it over the pool. Much less fiddly