Totally agree. We need more of them - persistent POIs.
And more importantly, we do actually need some way to generate our own destination waypoints. As an aviator I don't have much difficulty, but it could be so much easier to use than just the simplistic information we have - solely latitude, longitude and heading.
(I Also often wonder how the prime meridian is arbitrarily defined in E|D? Perhaps it was simply a start of the static galaxy definition such as prime meridian being closest to the body being orbited, and then subsequently *start galaxy now* was activated...)
Cheerz
Mark H
I just discovered this thread from commander Khelder. He is addressing those issues. Very well done. The app he designed is jaw dropping!
I am glad to discover that there is already a big move towards this, at least from the player side. This is the kind of functionality you are talking about Rampant, right?
- - - - - Additional Content Posted / Auto Merge - - - - -
There was a bug that reversed them, it was in the patch notes. They fixed it back.
It is correct now, with latitude first (top), and longitude second (bottom), on your hud.
Unfortunately during the bug a lot of coordinates got posted with them reversed, which makes life difficult when trying to figure out which is which.![]()
Alright, I believe that the way it is just now it’s OK. Let’s hope it will remain like that and not change again.