It would be great to have the option to lay pipes and power cables to connect different areas of the zoo to centralised power/water treatment areas. It doesn't makes sense to have to plop individual solar panels and water treatment tanks all around your zoo to cover their limited working range, rather than placing them in clusters to handle demand/capacity and then connecting to different areas of the zoo through cables and pipes.