Ride Coming Soon. Rides built over time.

You Design the ride test it etc. then it gets Built Over 1 - 2 Months with Signs "Ride coming Soon".
More complicated the ride longer it takes to get built. If the Park is Closed rides get built Faster.
At the Beginning of your park before it opens the game fast forwards the building period. once your with happy with your first few rides.
 
this is an iffy subject, I like the concept but it doesn't seem like a very important feature to me.

1-2 months is probably too long IMO, and I don't want my park being closed or fast forwarded like that.
 
You can have all sorts of options
open the ride early costs more money will it be worth it. It will cost you extra 2 Million to get the ride built Faster but you will only make 1 million in that Period in the Fall for instance. But during the Summer it might be worth Paying the Extra.

If the ride is opened to early it might not be fully tested causing injury or death to guests.
You have Rides coming soon when the ride does not open on time for what ever reason (weather, Money , Fault in testing) Guests demand refund.
If Injury or Death Happens the ride may be closed for a Period of time or be forced to Close (or a Bribe to keep it open) .
 
Last edited:
Technically most of this is in the game (or was in RCT3) already, it's just player controlled.
  • You can already add your own 'Coming Soon' signs
  • It'll probably take a couple of months to make the ride anyway
  • You can choose to rush and not test at the risk of injuring patrons
 
Hmm I dislike this idea it seems a bit too in depth as you are making the ride having a new ride coming soon on the station or somthing. At work bit otherwise I don't see it working.
 
Last edited:
Back
Top Bottom