Rollercoaster Transfer Track. (Adding/Removing Additional Trains)

Hi All,

Thinking about the coasters, i would also like to see a Coaster transfer track used to store unused/spare trains.
It would be really great if you could manage the coaster in such a way that extra trains will be automatically added/removed from the track
if there is a demand for it. (The Queue is getting to long or to short for example)
In real life this is done while the other train is just leaving the station and can be done within seconds for smaller coasters, and up to minutes for very large coasters.
An option like this would be great with a more realistic (Longer) night/day cycle, because there will be less people in the park at night for example, and having 3 trains
going down the track if there are only 20 people in the cue is a bit useless. ^^
And then in the morning when the attraction gets more crowded because more people are coming to the park, they coaster crew will add trains accordingly.

A example seen here: (Tumbling Track piece)
https://youtu.be/G7Pt8ue8ETk?t=1m15s

Another Example: (Small sliding track)
https://www.youtube.com/watch?v=uX-pBvDUUxg

Another Example: (Large Sliding Track section)
https://www.youtube.com/watch?v=6IuN1lnGlXQ

------------------------------------------------------------------------------------------
Planet Coaster build example: (Static transfer track with Depot building)
https://www.youtube.com/watch?v=51-UsfGoLGQ
------------------------------------------------------------------------------------------


Let me know what u think of this idea [squeeeeee]

Regards,
Randy
 
Last edited:

Vampiro

Volunteer Moderator
It was said in a livestream they like the idea of making this possible. And they would look into it :)
 
Back
Top Bottom