Salland's Adventure Zoo

The exterior is in the finishing phase. The windows and stones were placed in this phase. This also means that work can be done on the inside because rain can no longer enter.
-----------------------------------------------------------------------------

cBM3rZV.jpg


HFHux6l.jpg


mhhMU69.jpg


AbwtXmO.jpg


DNWwduF.jpg


NWjd48P.jpg


IGqqbxY.jpg


-----------------------------------------------------------------------------

Source: https://youtu.be/pEUYBi5WKAw
 
The interior of the office section is now decorated with building materials and construction equipment. The suspended ceiling has already been installed and they are now working on installing a partition wall.
-----------------------------------------------------------------------------

Al0W0pq.jpg


OdpkLtu.jpg


gVfbo6T.jpg


xl8IFXb.jpg


N4OilpL.jpg


ST4MqRv.jpg


wF4dFp8.jpg


K3TemLC.jpg


M3cKeFr.jpg


JxeojYI.jpg


1i3Bzr9.jpg


RYd6ehi.jpg


-----------------------------------------------------------------------------

Source: https://youtu.be/2BqNKIcBpPw
 
The restaurant has an open ceiling, which gives it an industrial look. Work is being done in various places, including where the kitchen will be installed. In the next update I will add some more clutter, because I think it is a bit too empty.
-----------------------------------------------------------------------------

center]


center]


center]


center]


center]


center]


center]


-----------------------------------------------------------------------------


Source: https://youtu.be/efB1IjTqlmg
 
As I mentioned last time, I've placed some clutter in the restaurant area. The layout of the second floor is also visible. This office floor will have the same layout as the ground floor. This office floor will have the same layout as the ground floor.
-----------------------------------------------------------------------------

XH24qxL.jpg


WXOtqnQ.jpg


0Tfs0mM.jpg


WfXy2jf.jpg


fEo2A7G.jpg


59oO1AS.jpg


-----------------------------------------------------------------------------

Source: https://youtu.be/3qGc0xvJO2E
 
I have installed the third and fourth floors. The machine room for the restaurant's ventilation system is located on the fourth floor. The shoring posts are the only details on these floors. I intend to remove some of the shoring posts at a later time.
-----------------------------------------------------------------------------

XIrTL1N.jpg


LsYJylQ.jpg


WYMzleV.jpg


0yFk3oe.jpg


zGy7a6P.jpg


mIgKe3x.jpg


mZjYftW.jpg


A499hg5.jpg


VngW1UE.jpg


CxOLEFm.jpg


t3lsmls.jpg


jQadIfJ.jpg


-----------------------------------------------------------------------------

Source: https://youtu.be/axhypuFrd-o
 
On the fifth floor, there are several meeting rooms and a cafeteria. This floor is also connected to the rooftop terrace. Unfortunately, I am not satisfied with the layout of the floor yet, so it could still change.
-----------------------------------------------------------------------------

TvR8RNo.jpg


m0ASNlJ.jpg


SqVyZ2K.jpg


X9RbPiC.jpg


wUjuLE0.jpg


Xwvhiyb.jpg


SpbhVNH.jpg


m5Efp2E.jpg


K0Vyqce.jpg


-----------------------------------------------------------------------------

Source: https://youtu.be/ayQpRUeddU4
 
The interior of the top floor has been completed. This is where the server room, archive room, and the executive office with a meeting room will be located. Additionally, the fire escape has been extended to the roof.
-----------------------------------------------------------------------------

ehtNOIs.jpg


VZcuWiN.jpg


EqRvF2O.jpg


zcGMkmJ.jpg


c2p3EKj.jpg


PVNhnpe.jpg


-----------------------------------------------------------------------------

Source: https://youtu.be/ahSHj9Gn7D0
 
On the roof of the office building, ventilation systems have been installed. These are intended for ventilation in the offices and the restaurant. Additionally, the finishing touches are being applied to the roof covering, so that a number of solar panels can still be installed.
-----------------------------------------------------------------------------

1zTMlq5.jpg


0ehyNjX.jpg


iwKuKuL.jpg


gmcLxuO.jpg


YUG4ByV.jpg


9kja81i.jpg


bdQydqA.jpg


6dtUngk.jpg


XNbSFtW.jpg


-----------------------------------------------------------------------------

Source: https://youtu.be/mh-14WJyDRg
 
The final step is the decoration of the terrace of the office block. The established company has already placed several objects, like an outdoor office/relaxation unit and a logo on the building and the reception area.

The name of the company is a thank you to ZSHplays for featuring my map on his YouTube channel.
-----------------------------------------------------------------------------

ehgTaHm.jpg


n4DCXHn.jpg


UoKUMSp.jpg


XRs5ugQ.jpg


vtV0bPD.jpg


bvHYGw1.jpg


wmtsnrI.jpg


Ziu9fCR.jpg


-----------------------------------------------------------------------------

Source: https://youtu.be/8MntT8Reyz8
 
The layout of the ground floor has been determined. From left to right: the bicycle storage, entrance to the apartments, shop and brasserie, and the stairs lead to the terrace. Because this is an unusual layout, I need to create the second floor first to be able to add details.
-----------------------------------------------------------------------------

WLoCXrt.jpg


RuvC0hZ.jpg


1XLaTzW.jpg


ucFmgEp.jpg


m1zhxOZ.jpg


iD50K0S.jpg


1sNdYDo.jpg


NysODah.jpg


-----------------------------------------------------------------------------

Source: https://youtu.be/NN5AwYMy7Jc
 
Here is the layout of the second floor. It's an unusual layout because from left to right, it goes as follows: apartment, entrance hall, sleeping area of another apartment, and the upper floor of the restaurant.
-----------------------------------------------------------------------------

Z5yypGY.jpg


rvr8BH3.jpg


FwkCa7Z.jpg


RAOCV0x.jpg


4XUq4rx.jpg


OCIzFdN.jpg


-----------------------------------------------------------------------------

Source: https://youtu.be/oLjCiuoOwW8
 
I have updated the map with the free new update that came with the Eurasia Pack DLC. I placed some mugs in the hotel, and the shelves in the animal clinic have been replaced with the new ones. Also, a few swans have taken residence in the pond.
-----------------------------------------------------------------------------

D2w33gH.jpg


LVc4T7D.jpg


H6fAxre.jpg


hvXMZJ6.jpg


xZyeTzL.jpg


nkrThxo.jpg


BYlIY3X.jpg


drLjV3R.jpg


cWw6imv.jpg


-----------------------------------------------------------------------------

Source: https://youtu.be/3Ko_Bmlrb7I
 
Back
Top Bottom