Liu Bajara/Silva Terminal -> Liu Bajara/Silva Terminal (score: 67896.948402)
Start CR: 4,294,081
Hops : 6
Jumps : 12
Gain CR : 399,620
Gain/Hop: 66,603.3
Final CR: 4,693,701
Load from Liu Bajara/Silva Terminal (462ls, BMk:N, Pad:L, Plt:N, Shp:Y, Out:Y, Ref:Y):
36 x Chemicals/Explosives 340cr vs 930cr, 4 hrs vs 5 days, total: 12,240cr
Unload at Ardh/Nusslein-Volhard Platform (1.15Kls, BMk:N, Pad:M, Plt:N, Shp:N, Out:Y, Ref:Y) => Gain 21,240cr (590cr/ton) => 4,471,503cr
Load from Ardh/Nusslein-Volhard Platform (1.15Kls, BMk:N, Pad:M, Plt:N, Shp:N, Out:Y, Ref:Y):
21 x Metals/Palladium 11,813cr vs 13,980cr, 5 days vs 5 days, total: 248,073cr
15 x Metals/Gold 8,984cr vs 10,796cr, 5 days vs 5 days, total: 134,760cr
Unload at Kivah/Sadi Carnot Ring (43ls, BMk:Y, Pad:L, Plt:N, Shp:Y, Out:Y, Ref:Y) => Gain 72,687cr (2,019.08cr/ton) => 4,544,190cr
Load from Kivah/Sadi Carnot Ring (43ls, BMk:Y, Pad:L, Plt:N, Shp:Y, Out:Y, Ref:Y):
36 x Medicines/Basic Medicines 314cr vs 4,527cr, 5 days vs 22 hrs, total: 11,304cr
Unload at Sosong/Chu Orbital (415ls, BMk:Y, Pad:M, Plt:N, Shp:N, Out:N, Ref:Y) => Gain 151,668cr (4,213cr/ton) => 4,695,858cr
Load from Sosong/Chu Orbital (415ls, BMk:Y, Pad:M, Plt:N, Shp:N, Out:N, Ref:Y):
19 x Metals/Gold 9,375cr vs 10,953cr, 22 hrs vs 4 days, total: 178,125cr
17 x Industrial Materials/Insulating Membrane 10,085cr vs 11,664cr, 22 hrs vs 4 days, total: 171,445cr
Unload at UBV 8670/Hurley Dock (195ls, BMk:N, Pad:L, Plt:N, Shp:Y, Out:Y, Ref:Y) => Gain 56,825cr (1,578.47cr/ton) => 4,752,683cr
Load from UBV 8670/Hurley Dock (195ls, BMk:N, Pad:L, Plt:N, Shp:Y, Out:Y, Ref:Y):
36 x Foods/Food Cartridges 124cr vs 753cr, 4 days vs 5 days, total: 4,464cr
Unload at Ardh/Nusslein-Volhard Platform (1.15Kls, BMk:N, Pad:M, Plt:N, Shp:N, Out:Y, Ref:Y) => Gain 22,644cr (629cr/ton) => 4,775,327cr
Load from Ardh/Nusslein-Volhard Platform (1.15Kls, BMk:N, Pad:M, Plt:N, Shp:N, Out:Y, Ref:Y):
21 x Metals/Palladium 11,813cr vs 14,004cr, 5 days vs 4 hrs, total: 248,073cr
15 x Metals/Gold 8,984cr vs 10,887cr, 5 days vs 4 hrs, total: 134,760cr
Unload at Liu Bajara/Silva Terminal (462ls, BMk:N, Pad:L, Plt:N, Shp:Y, Out:Y, Ref:Y) => Gain 74,556cr (2,071cr/ton) => 4,849,883cr
----------------------------------------------------------------------------
Finish at Liu Bajara/Silva Terminal (462ls, BMk:N, Pad:L, Plt:N, Shp:Y, Out:Y, Ref:Y) gaining 399,620cr (1,850cr/ton) => est 4,849,883cr total